ISRA FAST - 9H

ISRA FAST

Mix developed to facilitate on-site work through exceptionally rapid setting and drying capabilities.

ISRA FAST - 9H Image
    • Concrete mix that dries within a few hours after casting, allowing for early formwork removal and foot traffic
    • Provides an effective solution where the drying time of standard concrete slows down construction progress
    • Reduces work time and accelerates formwork removal from precast elements and walls
    • Can be applied by direct pouring, crane, or pump (standard/micro/static)
    • Maintain proper spacing between the casting mold and reinforcement
    • Ensure continuous casting without interruptions to prevent cold joints
    ISRA FAST - 9H Image

    Formwork design and removal must be carried out solely in accordance with the designer’s instructions.